Racks installation

Installation of mobile racks Flexirol – VARIA

Types of rail installation:

  • in an additional floor – it is a good solution for rooms with already finished floor. It does not require interference in the existing foundation. The additional floor can be color-matched to the appearance of the existing floor. In addition, the advantage of this solution is the ability to dismantle the additional floor and transfer it together with the mobile racks to another place.
  • in the ground, before carrying out the zero level – it is a good solution in the case of general renovation or construction of the room, when a new floor is being made.
  • in the ground, in cut channels, when the zero level already exists.
VARIA regały archiwalne Flexirol, étagères mobiles
VARIA regały archiwizacyjne Flexirol, étagères mobiles
VARIA regały przesuwne Flexirol, Scaffalature compattabili
VARIA regały Flexirol montażyści

We use laser leveler to level the rails.

Installation of the mobile racks takes place no later than 4 weeks from the date of signing the contract. The installation of rails is possible within 1-2 weeks from the date of signing the contract.

Whole VARIA installation team have certificates of completing the health and safety and fire protection course.

Installation of mobile racks

Timelapse - Installation of Flexirol mobile racks