Racks installation

Installation of the Forster – VARIA mobile racks

Types of rail installation:

  • in an additional floor – it is a good solution for rooms with already finished floor. It does not require interference in the existing foundation. The additional floor can be color-matched to the appearance of the existing floor. In addition, the advantage of this solution is the ability to dismantle the additional floor and transfer it together with the shelving system to another place.
  • in the ground, before carrying out the zero level – it is a good solution in the case of general renovation or construction of the room, when a new floor is being made.
  • in the ground, in cut channels, when the zero level already exists.

Installation of the shelving system takes place from 4 to 6 weeks from the date of signing the contract depending on the type of shelving. Installation of rails is possible within 1-2 weeks from the date of signing the contract.

VARIA regały przesuwne montaż
VARIA regały jezdne Flexirol montaż
VARIA regały jezdne Flexirol montaż
VARIA regały przesuwne montażyści

Varia - installation of mobile racks